Project References
KUALA LUMPUR METRO – MRT UNDERGROUND STATION, MALAYSIA

The project specified the application of Nukote ST (Pure Polyurea) over newly poured concrete. The client’s construction schedule required immediate coating after casting.
Nukote HLT followed by Nukote EP Prime II was applied to eliminate vapor entrapment and the potential of pin-holing of the finished surface. The completed coated area were buried within 24 hours after coating application was completed.