Project References
MARINA BAY SANDS RESORT SINGAPORE

The Marina Bay Sands Integrated Resort is located in the Central Business District of Singapore on Marina Bay. It is part of a large central development project on Marina Bay that includes; museums, high rise office towers, hotel, parks and the resort itself. The resorts construction started in the fall of 2007 and was completed in the fall of 2010 at a total cost of approximately $2Billion USD.
Nukote Coating Systems first became involved with the project in early fall 2008 at the request of Marina Bay Sands, to assist with the design and approval process for a blast mitigation coating system, to replace the specified plate steel protective layer which was to be installed below the traffic accessible points in the complex that covered basement level occupied spaces.
Nukote assisted Marina Bay Sands in the specification and approval required from the Ministry of Interior and Defense in Singapore. Nukote began working closely with Marina Bay Sands in a variety of specifications that included coordination with Aedas and Peridan, resulting in the use of a wide range of Nukote Coating Systems products in a variety of applications.
Projects include: Blast Mitigation, Gondola Canal Feature, Portable Water Storage, Hotel Towers Roofs, Hotel Towers Lift Roofs, Skypark Gardens, Skypark Structure Roofs